PolPartDesign - Tools for the development and design of plastic moulded parts
Intermittent load
- For intermittent tank loading, load cycles must be defined for the total operating time 1 / 2

- Inputs are per load cycle:
- maximum fill level
- minimum fill level
- proportion of time with maximum load (max. fill level)
- proportion of time with minimum load (min. fill level)
- the number of cycles
- Liquid/application temperature
- for each load cycle, the specific material data are calculated as orientation values and can be adopted
- the individual minimum wall thickness is calculated for each load cycle
- the load cycle with the greatest minimum wall thickness is decisive for the subsequent calculations
